Quotefx
Welcome to the feedback forum for Quotefx!
Our customer success team is dedicated to improving your quoting process, whether you’re looking to save time or money or both. This is a safe space created to let you have a voice! Please help us make our product better by submitting your feedback here.
-
Ability to give supplier visibility to user defined fields
We would like the ability to keep user defined fields as internal reference only (as they are now) or flag them to be shared with our suppliers.
1 voteunder review ·AdminSupplyframe (The industry network for electronics design and manufacturing, SupplyFrame) responded
Nice idea. We’ll consider this update for user defined fields.
-
Consolidate by MPN only
We would like the option to consolidate strictly by MPN w/out consideration of CPN. This would be beneficial both when a CPN is not provided and when doing commodity/annual bid projects.
1 voteunder review ·AdminSupplyframe (The industry network for electronics design and manufacturing, SupplyFrame) responded
This is a great suggestion! Thanks for taking the time to provide feedback to our team – this item is now under review for possible implementation.
-
RFQ Default Due Dates
Provide a setting to be able to change default due date for RFQs - currently the default is 14 days out.
0 votesunder review ·AdminSupplyframe (The industry network for electronics design and manufacturing, SupplyFrame) responded
Thanks for the suggestion. It is now being reviewed by our product management team.
-
User should be able to sort RFQ by status like the other columns
User should be able to sort RFQ by status like the other columns
1 voteunder review ·AdminSupplyframe (The industry network for electronics design and manufacturing, SupplyFrame) responded
Thanks for your suggestion. This is a great idea and we’ll look into making this a possibility for users!
-
Ability to hide all no bid parts to show what you actually quoted
There should be a way for those who quote, to look back at only the parts they quoted instead of sifting through screen after screen to look up parts on the quote.
3 votesunder review ·AdminSupplyframe (The industry network for electronics design and manufacturing, SupplyFrame) responded
Van, thanks for submitting this suggestion! It’s a great one and would certainly save quoters time. Our product team will consider adding this feature to the tool.
-
Manufacturer List Excel doc
Make the Manufacturer list under Supply Chain downloadable into an Excel doc.
2 votesunder review ·AdminSupplyframe (The industry network for electronics design and manufacturing, SupplyFrame) responded
Thanks for your suggestion! This is under review.
-
changes in costed BOM
I'd like to see Supplier Part number/MFR quoted on separate column, so I can to compare with us.
When we re-selected to different supplier, can system automatic changes without lick to “Remove” from other?-Cuc
1 vote -
Provide a way to view Findchips as an option for Awards
Currently there's no way to use Findchips as "a supplier option" for reference and be able to select/deselect it for Awards.
- Ruth
1 vote -
allow the supplier to add minimum/ multiples for each quantity on an RFQ? hence cut tape / tape and reel?
Could it be a way to allow the suppliers to add minimum/ multiples for each quantity on an RFQ? hence cut tape for smaller quantities / tape and reel for higher quantities?
5 votesunder review ·AdminSupplyframe (The industry network for electronics design and manufacturing, SupplyFrame) responded
Great suggestion. We’re currently exploring solutions for this item.
-
Is there any plan on having a quote package that will include automated labor quotes?
We are looking for a package that will not only provide material cost, but an automated labor quote. Assuming you would have to imput some parameters, we are looking for a package that can provide a compete automated RFQ. This would be a great feature to add to your new "face lift"
1 vote -
Ability to split awards in order to minimize excess
Be able to make multiple selections per line to minimize excess. (ex. select both reel and a cut tape volume when applicable)
During the selection process it would be nice if the system allowed for up to 2 selections per line in order to minimize excess. Ex. I have part XYZ for which I need a qty of 10k, and the reels are for 4k (Min/Mult=4K). The current system makes us select 3 reels driving 2k excess on this part. If the system would let us select 2 reels from supplier ABC, and 2k cut tape qty from another supplier…
8 votes -
Supplier side - set mandatory fields
Force suppliers to include pricing for all qtys being requested. Signal them with an error message to ensure all qtys are priced, would be a nice feature for leadtime, min / mult information.
11 votes -
Supplier side no alts to the aml/qml.
Do not allow suppliers to select a deviation and quote an alt mfg / mfg part number.
5 votes
- Don't see your idea?